top of page

Architecture Office: Brunton Boobyer Partnership Ltd. London Greenwich. UK
Completion: Still in progress on site.
Project Description: Two-phase residential development. The first phase includes conversion of existing buildings of Field House and part of its northern extension, conversion and alteration of existing terraced cottages and Rumneys to residential use. Retention of existing Sports pavilion, war memorial, water fountain and chapel, demolition of all other buildings and alterations to boundary flint wall along Steyning Road and The Twitten. The second phase includes new built residential buildings consisting of 53no new dwellings. A total of 93no new dwellings are being proposed within two phases(including conversions, houses and flats).
RIBA Work Stages: 3 - 4 (Spacial Coordination and Technical Design) 
My duties: Preparation of Building Regulations Drawings, drawings for Condition Discharge.

St Aubyns Campus and Field Site
bottom of page